Work orders and permit-to-work moved to EPTW. What to use in DAYCORE instead.
-
1
Work orders are handled in EPTW
The permit-to-work flow lives in the EPTW PowerApps application. DAYCORE no longer maintains its own work-order screens, so that the same workflow is not run in two places with two different answers.
-
2
Use the schedule flow for preventive work
For planning and tracking preventive maintenance, use Asset Care: Upload Schedule to bring in a batch, and Review & Approve to turn it into tickets for the field team.
-
3
Old data is still there
Historical work-order records are retained in the database for reference. Ask a system administrator if you need them exported.